Kitchen Project 2011
Monday, February 5, 2018
Thursday, August 4, 2011
Completion!
Most everything is done, a little touch up here and there and the south wall still needs to be grouted, but since the space was cleaned today I thought that I would take the photos and post them.
Not a double sink, but the ridge around the outside allows to put in drying racks in right or left or both. Also Missy loved the instant hot water for her tea! |
Back-splash behind the cook-top is stainless steel tile |
Thursday, July 14, 2011
Nearing the end
A fair amount has happened since Day 17, but I have not posted because most of the work was painting and cleaning and organizing. The granite and all the appliances including sink and instant hot water are all hooked up and working. Next project is to finish the trim and install the backsplash, which I picked up today.
Monday, June 27, 2011
Day 17 - Everyone comes home (for the first time)
Today was the final push to get everything looking as good as possible and move as much back in as possible. My parents helped finish painting, moving everything back in and a ton of cleaning. We ending up unpacking about 35 boxes and filling about 4 large contractor bags full of packing paper from all the dishes. Also thanks to my dad for all the pictures.
![]() |
After a long weekend of helping me, my parents and I have the place looking pretty good for everyone coming home. |
![]() |
doors and drawers in for the most part, still have trim to finish, kick plate to install etc. Also the cook-top and the dishwasher are not installed yet. |
![]() |
North wall, notice the magnets on the new white board wall. |
![]() |
TV and speakers in, not hooked up yet, but in place. |
![]() |
north wall from the back hall way. the keys are in the new place hanging on the wall by the back entrance. |
![]() |
Everyone pulling up from the airport |
![]() |
getting out of the car before we all went in together |
![]() |
first impressions |
![]() |
I think that she likes it |
![]() |
Everyone's is home! at least for the night. |
Sunday, June 26, 2011
Day 16 - Electrical done and more
Today started with my parents coming to help, the Electrician coming to finish up and a cleaning crew to help get everything but the kitchen clean and ready for the family to come home tomorrow. My parents worked really hard on painting and got a ton done up stairs and downstairs. I put two more coats on the white board wall and started trimming the cabinets. I also worked on the final Refrigerator install as well as the wine refrigerator install.
Example of after the cleaning crew came through ... you would not want to have seen the before picture of dust and drywall everywhere. |
My parents did a great job painting! |
Notice the crown molding, 3 fingers light rail and some door pulls are installed. |
The refrigerator is off its wheels and the final molding is in around and it is being used and making ice |
close up of the door pulls and the light rail. |
Saturday, June 25, 2011
Day 15 - Back on the floors
Waking up to open the windows and let the final air out of the place before everyone started to come over. Today the Electrician was here, the granite people measured again, abt dropped off my appliances and towards the end of the day my parents arrived to help!
Hooked up the water and the electric to the new frig |
After my parents made a trip to abt to get me the 24 inch case and return the 30 inch that somehow was on my order, the microwave is also in and the clock is working. |
My father, Jack, is here for the weekend to help and started in on painting, but needed a paint suit to keep his clothes clean. |
New color for the walls, not sure if you can tell, but it is a darker brown and looks great, thanks to Aunt Laura for the paint color! |
Subscribe to:
Posts (Atom)