Tuesday, June 14, 2011

Day 5 - Electrical and Pumbing

Today, was all about trying to finish what I can to be able to close in the walls with drywall by Thursday afternoon.  Since the flooring guys are coming on Sat. it would be nice to have most of the drywall upstairs finished by then.  Today I went to home depot a few times to get different pieces for the refrigerator water run that is going to be in the north wall.  I also helped the electrician pull some wires and I cut the holes for the speakers and mounted the bracket for the TV.

The new copper pipe coming up from the floor on the right and then stopping behind where the refrigerator is going.  After we drywall I will add the 1/4 tap and copper coil for the water and ice machine hook up.

with all the new circuits on the south wall and not enough depth to pass conduit over each other, the electrician has to carefully plan the layout and weave up and down. 

More up and down running of the conduit.

New data drops for the desk location.

Ran speaker wire for the in wall speakers and hung the bracket for the TV.

2 comments:

  1. Crazy how you had to install the up and down conduit. Looking forward to today's upday - huge progress so far.

    ReplyDelete
  2. it is either cut more holes in the wood, which would not be the best where we are hanging cabinets or do the up and down lopping conduit.